Torren Rail Junction Project
Home Torren Rail Junction Project
Torren Rail Junction Project
LaIng o Rourke
2017
Adelaide, Australia
The works called for the separation of freight and passenger lines at the Torrens Rail Junction. The existing rail junction placed a constraint on the strategically important Adelaide-to-Melbourne rail freight line with freight trains required to yield to passenger trains.
Endacom were engaged to do pile break of 700 piles, clean down the surface of the piles after excavation and prep work for rectification.
Endacom installed all the mesh reinforcement and strip drains for water diversion and Applied a final lining/Smoothing layer of shotcrete to the under pass .
Key Points
700 -PILE BREAKOUTS AND CLEANUP
STRIP DRAIN INSTALATION FOR WATERPROOFING AND REDIRECTION
FINAL LINING SHOTCRETE APPLIED TO UNDERPASS