Skip to main content

ECRL – Stub Tunnels – Sydney

NRT INFERSTRUCTURE JV
2018
NSW AUSTRALIA

Endacom were engaged in a design and construct tunnel support, rock bolt installation , strip drain installation , sprayed waterproof membrane, and a fibre shotcrete tunnel lining.

This work was carried out during three rail shutdowns and the job was only accessible by high rail making this a programme critical project to finish on time and budget .

Key Points

Spray applied water proof membrane to the tunnel lining

SUPPLY OF WATERPROOF SPRAYING AND SHOTCRETEING PLANT AND EQUIPMENT

SUPPLY OF SKILLED LABOUR AND INSTALLATION OF HAND DRILLED ROCK BOLTS

SHOTCRETE WORKS

Get In Touch

Use the below link to reach out to the Endacom team with your enquiry and let one of our dedicated team get back to you with a solution